When an authorized channel cannot commit, production still needs a date. DUOX ELECTRONICS checks franchise, direct, and open-market stock together, quotes only lots we can ship, and states the lead time and inspection path for that lot.
What we cover
We work from manufacturer, MPN, quantity, and the date the line needs the parts. If the original date cannot hold, approved alternates are called out so engineering can review them first.
Multi-channel coverage
Allocation, over-consumption, or a missed commit, with a second source of stock that can actually ship.
Alternates and market context
An alternate option, with the current lead time and price range, so procurement can decide.
Send the shortage list. We reply with availability, lead time, and the inspection path for that lot.
