Consumer programs leave little calendar room. DUOX ELECTRONICS covers schedule-driven shortages for overseas brands, ODMs, and EMS providers, and keeps full reels separate from partial reels.
The build window
An inquiry fits when an authorized lead time misses the window, on-hand stock cannot cover the build, allocation slips, or a discontinued part is still required. Say whether the date means arrival at the factory, line start, or the latest shipment. Transport, customs, and sampling are counted back from that date. Stock that lands with no time to retest is not on schedule.
| Parts that often go short | What usually happens |
|---|---|
| PMICs, chargers, RF, memory | One missing device can hold the build |
| Display and touch ICs | The window is short, and authorized dates often miss it |
| USB-C, FPC, board-to-board connectors | A different pitch, key, or mating height usually means a board or mechanical change |




